Fanatics 3 - Frazeyburg, Ohio

This location for Fanatics required (3) P60 glass turnstiles installed side-by-side, replacing the existing doors. We had to demo a large wall to make them fit, install the new turnstiles and wire the EntraPass Global Edition Access Control System.

EntraPass Global Edition Workstation

KT 400 Controllers

HID Proximity Readers

The Ohio installation was part of an 18-day trip – Start to Finish — Flew to Ohio, Drove to Florida, flew back to Colorado.

Completed Photos

Entrance 1 - Fanatics Ohio Facility
Fanatics-ohio-turnstiles-complete2
Entrance 2 - Fanatics Ohio Facility

Installation Photos: Day 1

This project required (3) P60 glass turnstiles installed side-by-side, replacing the existing glass doors.
We had to demo this wall to make them fit.

Day 2

After removing the doors and false walls, we put in a new header channel, taped, mudded
and prepared our EntraPass Access Control Cable for the Turnstiles.

Day 3

Fabrication of the P60s

Day 4

Wiring the EntraPass KT– 400 Controllers

Day 5 - Entrance 2

Another area of the same facility needed access control.We set up and placed the turnstiles on the open manufacturing floor, wiring them with EntraPass KT – 400 Controllers. Then, fence was installed to separate the secured and unsecured side.

Project Completed

Thank You to everyone in Ohio and at all of the Fanatics locations!